منابع مشابه
Project Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملThe New York High-Risk Project: a followup report.
The New York High-Risk Project began in 1971 as a prospective, longitudinal study of (1) children of one or two schizophrenic parents and (2) comparison groups of children whose parents had other or no psychiatric disorders. The former were examined because they were known to be at high risk--some 10-25 percent for children with one affected parent and 35-45 percent with two affected parents--f...
متن کاملUCLA UCLA Electronic Theses and Dissertations
of the Dissertation Studies in Non-Malleable Commitment
متن کاملUCLA UCLA Electronic Theses and Dissertations
OF THE THESIS A Unified Knowledge Representation System for Robot Learning and Dialogue
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Schizophrenia Bulletin
سال: 1987
ISSN: 0586-7614,1745-1701
DOI: 10.1093/schbul/13.3.505