منابع مشابه
Two-machine robotic cell considering different loading and unloading times
In this paper, the researchers have investigated a Concatenated Robot Move (CRM) sequence problem and Minimal Part Set (MPS) schedule problem with different setup times for two-machine robotic cell. They have focused on simultaneous solving of CRM sequence and MPS schedule problems with different loading and unloading times. They have applied a Simulated Annealing (SA) algorithm to provide a go...
متن کاملThe optimum route problem by genetic algorithm for loading/unloading of yard crane
In recent years, the scale of container transportation and the size of vessels are becoming larger and larger; development of automatic container cranes becomes a necessity. As a key function of automatic control of unmanned cranes, the optimum route can minimize the cycle time by calculating the most efficient combination of horizontal and vertical motions of container loading/unloading. In th...
متن کاملActive signaling of leg loading and unloading in the cockroach.
The ability to detect changes in load is important for effective use of a leg in posture and locomotion. While a number of limb receptors have been shown to encode increases in load, few afferents have been demonstrated to signal leg unloading, which occurs cyclically during walking and is indicative of slipping or perturbations. We applied mechanical forces to the cockroach leg at controlled r...
متن کاملThe XPS Approach to Loading and Unloading Terabyte Databases
The loader was developed on top of the existing Parallel Data Query (PDQ) iterator infrastructure. The loader and converter are iterators. The server treats the load iterator tree just like any other iterator tree and is able to use existing algorithms for parallelization and resource allocation. This also allows the loader functionality to have low level access to SQL functions. The XPS loader...
متن کاملtwo-machine robotic cell considering different loading and unloading times
in this paper, the researchers have investigated a concatenated robot move (crm) sequence problem and minimal part set (mps) schedule problem with different setup times for two-machine robotic cell. they have focused on simultaneous solving of crm sequence and mps schedule problems with different loading and unloading times. they have applied a simulated annealing (sa) algorithm to provide a go...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Discrete Applied Mathematics
سال: 2008
ISSN: 0166-218X
DOI: 10.1016/j.dam.2008.05.020