THE SINGLE-MACHINE MULTI-PRODUCT PROBLEM: NEAR OPTIMAL SCHEDULING

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes

In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem.  Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time

In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...

متن کامل

a mathematical programming model and genetic algorithm for a multi-product single machine scheduling problem with rework processes

in this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. we concern rework in the scheduling environment and propose a mixed-integer programming (mip) model for the problem.  based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

Near-Optimal Solutions of Large-Scale Single-Machine Scheduling Problems

Single Machine Scheduling Problems with Release Dates (SMSP) concern the optimal allocation of a set of jobs on a single machine, that cannot process more than one job at a time. Each job is ready for processing at a release date and it has to be processed without interruption. The goal is to minimize the total weighted completion time of the jobs. In this paper the time-indexed formulation is ...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The International Conference on Applied Mechanics and Mechanical Engineering

سال: 1984

ISSN: 2636-4360

DOI: 10.21608/amme.1984.50314