The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Break fill-dam simulation using GeoStudio (case study: Safarood earth dam, Kerman)

One of the main reason of earth-dam breaks is inner erosion which is caused by washing fine soil particles and finally lead to seepage inside the dam. Seepage will decrease effective tension in the earth-dam's core and arching phenomena is occurred. More settlement of core than to shell is the consequence of arching and occurrence of cracking. In this paper, GeoStudio software based on finite e...

متن کامل

Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...

متن کامل

Investigate probability of damage of Earth dam under Near-field and Far –field earthquake : Case study Gotvand earth dam

The main goal of preset research is investigate the effects of vertical component of Near-Fault and Far-Field earthquake records on the probability of overtopping induced damage of earth dam due to the reduction of freeboard due to the settlement of dam crest. In this respect 12 different earthquake record are selected. Nonlinear dynamic analysis of earth dam is implemented with FLAC 3D using F...

متن کامل

Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies

Construction projects are initiated in dynamic environment which result in circumstances of high uncertainty and risks due to accumulation of many interrelated parameters. The purpose of this study is to use novel analytic tools to evaluate the construction projects and their overall risks under incomplete and uncertain situations. It was also aimed to place the risk in a proper category and pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Civil Engineering Journal

سال: 2016

ISSN: 2476-3055

DOI: 10.28991/cej-2016-00000022