The Responsibility of Business and Information Systems Engineering in Large-Scale IT Projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Responsibility of Business and Information Systems Engineering in Large-Scale IT Projects - Symptoms, Diagnosis, and Therapy

The failure of IT projects has been subject to discussions for decades. For example, magazines report on historical failures of IT projects in the U.S. (Zeitler 2008), consulting firms analyze the failure of large-scale IT projects (Richter et al. 2008), and also science provides detailed studies about failures in selected major IT projects in Germany (Mertens 2009). Often, the so-called CHAOS ...

متن کامل

The Challenge of Large-Scale IT Projects

The trend in the world of Information Technology (IT) is getting increasingly large and difficult projects rather than smaller and easier. However, the data on large-scale IT project success rates provide cause for concern. This paper seeks to answer why large-scale IT projects are different from and more difficult than other typical engineering projects. Drawing on the industrial experience, a...

متن کامل

Green IT: A Matter of Business and Information Systems Engineering?

Recently, Green IT has been discussed with different levels of intensity. Manufacturers, associations, and trade shows are dealing with this subject. Green IT contests are announced and Green IT alliances are formed in addition to Green IT being an objective of public funding programs. Initially, the discussions focused on energy and resource consumption of information technology. As an example...

متن کامل

construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers

the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...

Really Rapid Prototyping of Large-Scale Business Information Systems

❏ Despite the large number of methodologies, standards, and tools, large-scale information system development remains a challenging task. ❏ The percentage of unsuccessful development projects in terms of exceeding time and/or budget is constantly between 50% and 70%.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Business & Information Systems Engineering

سال: 2011

ISSN: 1867-0202

DOI: 10.1007/s12599-011-0146-8