The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Resource Leveling Problem with Multiple Resources Using an Adaptive Genetic Algorithm

Resources management ensures that a project is completed on time and at cost, and that its quality is as previously defined; nevertheless, resources are scarce and their use in the activities of the project leads to conflicts in the schedule. Resource leveling problems consider how to make the resource consumption as efficient as possible. This paper presents a new Adaptive Genetic Algorithm fo...

متن کامل

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

Using Hopfield to Solve Resource-Leveling Problem

Although the traditional permute matrix coming along with Hopfield is able to describe many common problems, it seems to have limitation in solving more complicated problem with more constrains, like resource leveling which is actually a NP problem. This paper tries to find a better solution for it by using neural network. In order to give the neural network description of resource leveling pro...

متن کامل

An Effective Genetic Algorithm for Solving the Multiple Traveling Salesman Problem

The multiple traveling salesman problem (MTSP) involves scheduling m > 1 salesmen to visit a set of n > m nodes so that each node is visited exactly once. The objective is to minimize the total distance traveled by all the salesmen. The MTSP is an example of combinatorial optimization problems, and has a multiplicity of applications, mostly in the areas of routing and scheduling. In this paper,...

متن کامل

designing a decision support system (dss) schema with applying genetic algorithm for survey of resource leveling problem-(vehicles)

resource leveling and allocation are two basic categories for project management. the objective of resource allocation is to schedule activities so that a particular resource does not exceed a specific limit in any given project time period, while holding the project duration to a minimum. the resource leveling problem arises when there are sufficient resources available and it is necessary to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Automation in Construction

سال: 2013

ISSN: 0926-5805

DOI: 10.1016/j.autcon.2012.10.003