The project design of closure with cofferdam in a large reclamation project

نویسندگان

چکیده

The closure of the reclamation project generally requires that sluice has been built and can be normally opened closed for drainage. There is a large amount follow-up work after closured this project. In order to reach safe flood control standard next typhoon season closure, reduce risk, strive sufficient time subsequent construction seawall, it necessary in advance under condition not yet opened. Therefore, demonstrated feasibility with cofferdam based on premise think outside box theoretical calculation. successful completion acceptance proved successful.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Identifying and evaluating individual factors of project manager contributing to project success in project-based organizations

In recent years, The importance key success factors  has led organizations to focus more on these factors. project management is one of the factors greatly affecting project success. Having a qualified and competent project manager is the first step to actual project success. In this study, the individual factors and important competencies of the project manager have been investigated. The sta...

متن کامل

investigating the integration of translation technologies into translation programs in iranian universities: basis for a syllabus design in translation technology

today, information technology and computers are indispensable tools of any profession and translation technologies have become an indispensable part of translator’s workstation. with the increasing demands for high productivity and speed as well as consistency and with the rise of new demands for translation and localization, it is necessary for translators to be familiar with market demands an...

A Simulation Based of Setting Policy in Project Acceptance Based on Experiences in Project-Driven SME's

The acceptance of the right project which leads to the realization of the set objectives is one of the most important issues in project-oriented companies. Therefore, corporate managers prefer to work on those projects which ensures the achievement of goals such as increasing financial profits or being the top brands in their rivals market. The present  research aimed at introducing  a systemat...

متن کامل

learner autonomy in a computer-assisted project-based efl reading classroom

آموزش برمبنای ذخیره اطلاعات ، دانشجویان را به عنوان افرادی غیر متفکر وغیرقابل کنترل می پندارد . در همین راستا ، خواندن در سیستم آموزشی برمبنای ذخیره اطلاعات ، مهارتی پنداشته می شود که می توان آن را با یاد گرفتن انفعالی وجداگانه تعدادی از مهارتهای جزیی فراگرفت . درآن سو خواندن در سیستم آموزشی برمبنای طرح مسآله ،به عنوان رفتاری نقادانه تلقی می شود که از طریق آن می توان دنیای فرای کلمات را کشف کرد...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: E3S web of conferences

سال: 2021

ISSN: ['2555-0403', '2267-1242']

DOI: https://doi.org/10.1051/e3sconf/202129302034