The processor minimization problem with independent waiting-time constraints
نویسندگان
چکیده
منابع مشابه
Two-stage Interval Time Minimization Transportation Problem with Capacity Constraints
This paper discusses a two-stage interval time minimization transportation problem with capacity constraints on each source-destination link. In the current problem, the exact total demand of all the destinations lies in an interval whose end points are equal to the minimum and the maximum total available amount of the homogeneous product (which is being transported), at the sources. The minimu...
متن کاملFacility Location with Stochastic Demand and Constraints on Waiting Time
W analyze the problem of optimal location of a set of facilities in the presence of stochastic demand and congestion. Customers travel to the closest facility to obtain service; the problem is to determine the number, locations, and capacity of the facilities. Under rather general assumptions (spatially distributed continuous demand, general arrival and service processes, and nonlinear location...
متن کاملOptimization with the time-dependent Navier-Stokes equations as constraints
In this paper, optimal distributed control of the time-dependent Navier-Stokes equations is considered. The control problem involves the minimization of a measure of the distance between the velocity field and a given target velocity field. A mixed numerical method involving a quasi-Newton algorithm, a novel calculation of the gradients and an inhomogeneous Navier-Stokes solver, to find the opt...
متن کاملOn the Workflow Satisfiability Problem with Class-independent Constraints
A workflow specification defines sets of steps and users. An authorization policy determines for each user a subset of steps the user is allowed to perform. Other security requirements, such as separation-of-duty, impose constraints on which subsets of users may perform certain subsets of steps. The workflow satisfiability problem (WSP) is the problem of determining whether there exists an assi...
متن کاملSOC Test Time Minimization Under Multiple Constraints
In this paper, we propose a SOC (system-on-chip) test scheduling technique that minimizes the test application time while considering test power limitations and test conflicts. The test power consumption is important to consider since exceeding the system’s power limit might damage the system. Our technique takes also into account test conflicts that are due to cross-core testing (testing of in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Theoretical Computer Science
سال: 1994
ISSN: 0304-3975
DOI: 10.1016/0304-3975(94)90291-7