In the Multi-Spreader Crane Scheduling Problem (MSCSP), containers with identical dimensions but variable weights are arranged along a grid. A multi-spreader crane is used to lift all containers. The has m > 1 modes. When it in p th mode, can remove adjacent same row at time as long total weight of does not exceed loading capacity ? . Such takes h minutes. It also c , q minutes for switch from mode when ? goal find sequence so that minimized. This paper investigates computational complexity MSCSP. First, we establish connection between greedy sequences and supersequences. We then prove MSCSP NP-hard three or more modes by reduction version Shortest Common Supersequence problem. Lastly, investigate two problems arise naturally heuristics solve show one be solved using dynamic programming while other remains computationally hard. provide an approximation algorithm behaves nicely changeover times much larger than lifting crane.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

Addressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm

Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...

متن کامل

A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach

Keywords: Quay crane assignment Quay crane scheduling Genetic algorithms Integrated models a b s t r a c t This paper presents a new approach to analyze the integrated quay crane assignment and scheduling problem (QCASP). The problem determines the assignment of quay cranes to vessels and the sequence of tasks to be processed by each quay crane simultaneously, and accounts for important conside...

متن کامل

A Branch-and-Cut algorithm for factory crane scheduling problem

The factory crane scheduling problem (FCSP) deals with assigning delivery tasks to cranes and then sequencing them, in order to minimize the total completion time for all tasks. In this paper, delivery tasks for required jobs are preemptive allowed at most once before the jobs arrive at exit. The preemptive jobs are temporarily stored in a buffer stack, in which jobs pickup and delivery should ...

متن کامل

the combinatorial multi-mode resource constrained multi-project scheduling problem

this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Applied Mathematics

سال: 2021

ISSN: ['1872-6771', '0166-218X']

DOI: https://doi.org/10.1016/j.dam.2020.10.012