The Multi-period Multi-trip Container Drayage Problem with Release and Due Dates
نویسندگان
چکیده
The Container Drayage Problem (CDP) aims at routing a fleet of trucks, based common terminal, to serve customers while minimizing the total travel distance. Each trip starts from and ends handles subset customers. customer requires either that container is picked up or delivered. We introduce more realistic variant, i.e., Multi-trip Multi-period CDP with Release Due Dates (MM-CDP-RDD), in which planning horizon composed several periods (days). On each day, truck may perform than one respecting (RDD) associated services, corresponding first last day on service can be carried out, respectively. Drivers’ contracts impose limitations maximum driving time allowed two consecutive days whole weekly horizon. To model MM-CDP-RDD, we propose both an Arc-based Integer Linear Programming (ILP) formulation Trip-based ILP receives as input all feasible non-dominated trips. efficiently address medium/large-sized instances problem, also design six Combinatorial Benders’ Cuts approaches. All methods are compared rich set generated for this new problem.
منابع مشابه
Multi-period Vehicle Routing Problem with Due dates
In this paper we study the Multi-period Vehicle Routing Problem with Due dates (MVRPD), where customers have to be served between a release and a due date. Customers with due dates exceeding the planning period may be postponed at a cost. A fleet of capacitated vehicles is available to perform the distribution in each day of the planning period. The objective of the problem is to find vehicle r...
متن کاملThe Multi-Trip Vehicle Routing Problem with Time Windows and Release Dates
The Multi Trip Vehicle Routing Problem with Time Windows and Release Dates is a variant of the Multi Trip Vehicle Routing Problem where a time windows is associated with each customer and a release date is associated with each merchandise to be delivered at a certain client. The release date represents the moment the merchandise becomes available at the depot for final delivery. The problem is ...
متن کاملa multi-objective model for the location routing problem with fuzzy travel times and due dates
in this study the location routing problem with fuzzy parameters is taken into account, this problem involves determining the location of the depots and routing of the vehicles in order to serve the customers. in this study a location routing problem with fuzzy travel times and due dates is considered and two objective models are proposed. the considered objectives are minimizing the total cost...
متن کاملThe Vehicle Routing Problem with Release and Due Dates
FACULTY OF SOCIAL, HUMAN AND MATHEMATICAL SCIENCES Mathematical Sciences Doctor of Philosophy THE VEHICLE ROUTING PROBLEM WITH RELEASE AND DUE DATES: FORMULATIONS, HEURISTICS AND LOWER BOUNDS Benjamin C. Shelbourne A novel extension of the classical vehicle routing and scheduling problem is proposed that integrates aspects of machine scheduling into vehicle routing. Associated to each customer ...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Operations Research
سال: 2021
ISSN: ['0305-0548', '1873-765X']
DOI: https://doi.org/10.1016/j.cor.2020.105102