The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
نویسندگان
چکیده
منابع مشابه
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
متن کاملThe Resource-Constrained Multi-Mode Project Scheduling Problem
This chapter reports on a new solution approach for the multi-mode resource-constrained project scheduling problem (MRCPSP, MPS|prec|Cmax). This problem type aims at the selection of a single activity mode from a set of available modes in order to construct a precedence and a (renewable and non-renewable) resource-feasible project schedule with a minimal makespan. The problem type is known to b...
متن کاملPreemption in multi-mode Resource-constrained project scheduling problem
Preemption in multi-mode Resource-constrained project scheduling problem Zahra Zare* Department of Industrial Engineering Najafabad Branch, Islamic Azad University, Isfahan, Iran Postal Code: 71767-13763, Unit 3, No 142, 6 Alley, South Bahonar St., Shiraz, Iran Abdulreza Naddaf Department of Management Shiraz University, Shiraz, Iran Maysam Ashrafzadeh Department of Industrial Engineering Najaf...
متن کاملA Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Scheduling
سال: 2014
ISSN: 1094-6136,1099-1425
DOI: 10.1007/s10951-014-0402-0