The minimum cost optimal power flow problem solved via the restart homotopy continuation method
نویسندگان
چکیده
منابع مشابه
Hydrothermal Optimal Power Flow Using Continuation Method
The problem of optimal economic operation of hydrothermal electric power systems is solved using powerful continuation method. While in conventional approach, fixed generation voltages are used to avoid convergence problems, in the proposed algorithm, they are treated as variables so that better solutions can be obtained. The algorithm is tested for a typical 5-bus and 17-bus New Zealand networ...
متن کاملA Novel Experimental Analysis of the Minimum Cost Flow Problem
In the GA approach the parameters that influence its performance include population size, crossover rate and mutation rate. Genetic algorithms are suitable for traversing large search spaces since they can do this relatively fast and because the mutation operator diverts the method away from local optima, which will tend to become more common as the search space increases in size. GA’s are base...
متن کاملThe Minimum Universal Cost Flow in an Infeasible Flow Network
In this paper the concept of the Minimum Universal Cost Flow (MUCF) for an infeasible flow network is introduced. A new mathematical model in which the objective function includes the total costs of changing arc capacities and sending flow is built and analyzed. A polynomial time algorithm is presented to find the MUCF.
متن کاملNumerical Polynomial Homotopy Continuation Method to Locate All The Power Flow Solutions
The manuscript addresses the problem of finding all solutions of power flow equations or other similar nonlinear system of algebraic equations. This problem arises naturally in a number of power systems contexts, most importantly the direct methods for transient stability analysis and voltage stability assessment. Here we introduce a novel form of homotopy continuation method called the numeric...
متن کاملA Fuzzy Random Minimum Cost Network Flow Programming Problem
In this paper, a fuzzy random minimum cost flow problem is presented. In this problem, cost parameters and decision variables are fuzzy random variables and fuzzy numbers respectively. The object of the problem is to find optimal flows of a capacitated network. Then, two algorithms are developed to solve the problem based on Er-expected value of fuzzy random variables and chance-constrained pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Power Systems
سال: 1989
ISSN: 0885-8950
DOI: 10.1109/59.32471