The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dam Safety During Design, Construction and Operation

Introduction In the foreword to the Malaysian Guidelines for Operation, Maintenance and Surveillance of Dams (Malaysian Inter-Departmental Committee on Dam Safety 1989), it is stated “The expanding inventory of dams has brought into focus the subject of dam safety”. At the time of the guideline publication, there had been a considerable increase in the inventory of dams with those constructed d...

متن کامل

construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers

the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...

Bayesian project diagnosis for the construction design process

This study demonstrates how subtle signals taken from the early stages within a construction process can be used to diagnose potential problems within that process. For this study, the construction process is modelled as a quasi-Markov chain. A set of six different scenarios representing various common problems (e.g. small budget, complex project) are created and simulated by suitably defining ...

متن کامل

The Impact of Design Rework on Construction Project Performance

Rework in construction development projects can significantly degrade project cost and schedule performance. In a typical construction development project which involves design and construction, rework in the construction phase could increase construction cost by 10%-15% of the contract price (Burati. 1992, Josephson & Hammerlund 1999, Love & Li 2000). The proportion of money and time spent on ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Acta Energetica

سال: 2015

ISSN: 2300-3022,2300-3022

DOI: 10.12736/issn.2300-3022.2015103