The Heuristic Methods for Assembly Line Balancing Problem: A Case of Vietnam Garment Industry

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

genetic algorithms for assembly line balancing problem

there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to c...

متن کامل

Solving a Multi Objective Mixed Model Assembly Line Balancing Problem in Garment Industry

The motivation of our work is from the paper by Chen et al. (2012) in which the assembly line balancing (ALB) problem in the garment manufacturing process for a single model is solved by using genetic algorithm. Out of four steps of manufacturing the product, we focus on the third step in their paper in which there is a sewing line which is to be operated by different employees having different...

متن کامل

Meta-heuristic Approaches for the Assembly Line Balancing Problem

Assembly line balancing problem (ALBP) is a decision problem arising when designing or redesigning an assembly line and it consists in finding the optimal assignment of tasks among the workstations corresponding to some objectives. This paper deals with the single-model ALBP with the aim of minimizing the cycle time and maximizing the workload smoothness among the workstations. In order to solv...

متن کامل

Exact and Heuristic Methods for the Assembly Line Worker Assignment and Balancing Problem

In traditional assembly lines, it is reasonable to assume that task execution times are the same for each worker. However, in sheltered work centres for disabled this assumption is not valid: some workers may execute some tasks considerably slower or even be incapable of executing them. Worker heterogeneity leads to a problem called the assembly line worker assignment and balancing problem (ALW...

متن کامل

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology

سال: 2019

ISSN: 2321-9653

DOI: 10.22214/ijraset.2019.4407