The economic production quantity with rework process in supply chain management

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The economic production quantity with rework process in supply chain management

Cardenas-Barron [L.E. Cardenas-Barron, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers and Industrial Engineering 57 (2009) 1105–1113] minimizes the annual total relevant cost TC(Q , B) to find the economic production quantitywith rework process at amanufacturing system and assumes that TC(Q , B) is convex. So, the solut...

متن کامل

Economic production quantity with rework process at a single-stage manufacturing system with planned backorders

In traditional inventory models such as the economic order quantity (EOQ) and the economic production quantity (EPQ) the sole objective is to minimize the total inventory-related costs, typically holding cost and ordering cost. These models do not consider the presence of defective products in the lot or rework of them. Recently, Jamal, Sarker, and Mondal (Jamal, A. A. M., Sarker, B. R., & Mond...

متن کامل

An Economic Production Quantity Model for Defective Items with Sales Return Service, Scrap Items and Rework

In this model, we establish an inventory model to determine the optimal inventory replenishment scheme for the economic production quantity (EPQ) model for imperfect, deteriorating items with sales return service under multiple production and rework setup. In one cycle, production process can produces the products in m production setups and reworks the defective items in one rework setup. The c...

متن کامل

Economic production quantity (EPQ) model for three type imperfect items with rework and learning in setup

Imperfect quality items are unavoidable in an inventory system due to imperfect production process, natural disasters, damages, or many other reasons. The setup cost and production cycle time can be related in terms of process deterioration and learning and forgetting effects. Learning reduces production run length and setup cost, whereas deterioration and forgetting increases both. Keeping the...

متن کامل

Economic Production Quantity Model with Backordering, Rework and Machine Failure Taking Place in Stock Piling Time

This paper investigates the optimal inventory replenishment policy for an economic production quantity (EPQ) model with backordering, rework and machine breakdown taking place in stock piling time. A prior paper by Chiu has examined the lot-sizing problem on an imperfect quality EPQ model. Due to another reliability factor random machine breakdown seems to be inevitable in most real world manuf...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Mathematics with Applications

سال: 2011

ISSN: 0898-1221

DOI: 10.1016/j.camwa.2011.07.039