THE CRAIGELLACHIE VIADUCT (INCLUDING PLATES).
نویسندگان
چکیده
منابع مشابه
buckling of viscoelastic composite plates using the finite strip method
در سال های اخیر، تقاضای استفاده از تئوری خطی ویسکوالاستیسیته بیشتر شده است. با افزایش استفاده از کامپوزیت های پیشرفته در صنایع هوایی و همچنین استفاده روزافزون از مواد پلیمری، اهمیت روش های دقیق طراحی و تحلیل چنین ساختارهایی بیشتر شده است. این مواد جدید از خودشان رفتارهای مکانیکی ارائه می دهند که با تئوری های الاستیسیته و ویسکوزیته، نمی توان آن ها را توصیف کرد. این مواد، خواص ویسکوالاستیک دارند....
Uncertain natural frequency analysis of composite plates including effect of noise – A polynomial neural network approach
This paper presents the quantification of uncertain natural frequency for laminated composite plates by using a novel surrogate model. A group method of data handling in conjunction to polynomial neural network (PNN) is employed as surrogate for numerical model and is trained by using Latin hypercube sampling. Subsequently the effect of noise on a PNN based uncertainty quantification algorithm ...
متن کاملPour plates or streak plates?
The pour plate method of counting bacteria is more precise than the streak plate method, but, on the average, it will give a lower count.
متن کاملThe Infamous Gusset Plates
The collapse resulted in the media’s search for immediate answers to the following two questions; why did the bridge collapse and who is to blame? Speculative answers to the first question were proposed by the “Average Joe” and structural engineering experts alike, and involved the usual suspects; the growth from microscopic to catastrophic lengths of undetected cyclic load-induced fatigue crac...
متن کاملDetailed design of the main bridge – viaduct spans in Padma Multipurpose Bridge project, Bangladesh
The Padma Multipurpose Bridge Design Project comprises a new fixed crossing of the Padma River in Bangladesh, which will consist of a new main bridge approximately 6.15km long with spans crossing the Padma River. Viaduct spans on both sides of the Padma River support both the highway and railway traffic and lead this traffic onto the upper and lower levels of the main bridge. The length of the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Minutes of the Proceedings of the Institution of Civil Engineers
سال: 1866
ISSN: 1753-7843
DOI: 10.1680/imotp.1866.23188