The coordination of transportation and batching scheduling
نویسندگان
چکیده
منابع مشابه
Logistics scheduling with batching and transportation
This paper studies a general two-stage scheduling problem, in which jobs of different importance are processed by one first-stage processor and then, in the second stage, the completed jobs need to be batch delivered to various pre-specified destinations in one of a number of available transportation modes. Our objective is to minimize the sum of weighted job delivery time and total transportat...
متن کاملCoordinated scheduling on single serial batching machine with transportation considerations
The coordination of production scheduling and transportation has recently received a lot of attention in logistics and supply chain management. We study a coordinated scheduling problem, in which each job is transported to a single serial batching machine for further processing, each batch to be processed occurs a processing cost, and the objective is minimizing the sum of the makespan and the ...
متن کاملFlowshop scheduling problems with transportation or deterioration between the batching and single machines
0360-8352/$ see front matter 2008 Elsevier Ltd. A doi:10.1016/j.cie.2008.07.022 * Corresponding author. Tel./fax: +86 24 83680169 E-mail addresses: [email protected] (L. Tang In this paper, we consider two new types of the two-machine flowshop scheduling problems where a batching machine is followed by a single machine. The first type is that normal jobs with transportation between machin...
متن کاملScheduling a Batching Machine
We address the problem of scheduling n jobs on a batching machine to minimize regular scheduling criteria that are non-decreasing in the job completion times. A batching machine is a machine that can handle up to b jobs simultaneously. The jobs that are processed together form a batch, and all jobs in a batch start and complete at the same time. The processing time of a batch is equal to the la...
متن کاملCoordination of Production and Transportation in Supply Chain Scheduling
This paper investigates a three-stage supply chain scheduling problem in the application area of aluminium production. Particularly, the first and the third stages involve two factories, i.e., the extrusion factory of the supplier and the aging factory of the manufacturer, where serial batching machine and parallel batching machine respectively process jobs in different ways. In the second stag...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2009
ISSN: 0307-904X
DOI: 10.1016/j.apm.2009.01.002