The Contractor Perception Towers Industrialised Building System Risk in Construction Projects in Malaysia

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach

An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...

متن کامل

In-situ Cast Concrete Building Important Aspects of Industrialised Construction

In the ongoing research programme at Chalmers University of Technology, principles and methods for industrialised building with in-situ cast concrete are investigated. The goal is to increase the understanding of, and to develop methods and systems for, industrial building/construction. Improvement of in-situ concrete construction is necessary; partly in order to meet challenges from other mate...

متن کامل

The Role of Knowledge Management in Improving the Adoption and Implementation Practices of Industrialised Building System (IBS) in Malaysia

In Malaysia, the strategic changes towards the promotion of the concept of Industrialized Building System (IBS) started in 1998. It is envisaged that the benefits expected from the adoption of IBS will have positive and dramatic impact on the culture of building practices. An important issue which is likely to influence the wider and successful implementation of IBS is the role that knowledge m...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Modeling construction time in Spanish building projects

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: American Journal of Applied Sciences

سال: 2009

ISSN: 1546-9239

DOI: 10.3844/ajas.2009.937.942