The construction schedule of medium voltage overhead distribution network is optimized based on neural network algorithm
نویسندگان
چکیده
INTRODUCTION: The field of mechanical engineering technology is an emerging technical with many research directions, and there are directions intersection other disciplines, among which the has outstanding advantages. With continuous development technology, direction applied to also continuously enriched developed. Mechanical focuses on realizing monitoring control dynamic performance systems, as well integration design system control.
 OBJECTIVES: In order improve disassembly efficiency, reduce cost energy consumption, it optimized using social methods achieve better results consumption.
 METHODS: Aiming at drive anti-skid strategy four-wheel hub motor, was simulated improved algorithms, based this, three road recognition algorithms were selected for low, medium, high adhesion verification.
 RESULTS: Through study automobile system, basic structure summarized some solution measures proposed. A new type proposed problems vibration noise brake. anti-slip characterized by simple structure, easy maintenance, reliable operation, operation efficiency.
 CONCLUSION: This shows that not only excellent effect, but good performance. addition, this able ensure safe brakes in various harsh environments. a device can be widely used driving force wheels, great significance.
منابع مشابه
analysis of power in the network society
اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...
15 صفحه اولOverhead-Optimized Gamma Network Codes
We design a network coding scheme with minimum reception overhead and linear encoding/decoding complexity.
متن کاملIdentifying Flow Units Using an Artificial Neural Network Approach Optimized by the Imperialist Competitive Algorithm
The spatial distribution of petrophysical properties within the reservoirs is one of the most important factors in reservoir characterization. Flow units are the continuous body over a specific reservoir volume within which the geological and petrophysical properties are the same. Accordingly, an accurate prediction of flow units is a major task to achieve a reliable petrophysical description o...
متن کاملassessment of the efficiency of s.p.g.c refineries using network dea
data envelopment analysis (dea) is a powerful tool for measuring relative efficiency of organizational units referred to as decision making units (dmus). in most cases dmus have network structures with internal linking activities. traditional dea models, however, consider dmus as black boxes with no regard to their linking activities and therefore do not provide decision makers with the reasons...
The dependence identification neural network construction algorithm
An algorithm for constructing and training multilayer neural networks, dependence identification, is presented in this paper. Its distinctive features are that (i) it transforms the training problem into a set of quadratic optimization problems that are solved by a number of linear equations, (ii) it constructs an appropriate network to meet the training specifications, and (iii) the resulting ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: EAI Endorsed Transactions on Energy Web
سال: 2023
ISSN: ['2032-944X']
DOI: https://doi.org/10.4108/ew.3716