The chain-reentrant shop with the no-wait constraint

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Comparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints

The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...

متن کامل

Solving Re-entrant No-wait Flow Shop Scheduling Problem

In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...

متن کامل

Hybrid Particle Swarm Optimization for Stochastic Flow Shop Scheduling With No-wait Constraint

The flow shop scheduling with the no-wait constraint is a typical NP-hard combinatorial optimization problem and represents an important area in production scheduling. In this paper, a class of particle swarm optimization (PSO) approach with simulated annealing (SA) and hypothesis test (HT), namely PSOSAHT is proposed for the stochastic flow shop scheduling with no-wait constraint to minimize t...

متن کامل

Optimal job insertion in the no-wait job shop

The No-Wait Job Shop (NWJS) considered here is a version of the job shop scheduling problem where, for any two operations of a job, a fixed time lag between their starting times is given. Also, sequence-dependent set-up times between consecutive operations on a machine can be present. The NWJS problem consists in finding a schedule that minimizes the makespan. We address here the so-called Opti...

متن کامل

Cyclic production for the robotic balanced no-wait flow shop

Abstract. In a no-wait robotic flow-shop, the parts are transferred from a machine to another one by a robot and the time a part can remain on a machine is fixed. The objective is to maximize the throughput rate of the cell, i.e. to find optimal cyclic robot moves. In this paper, we consider identical parts in the balanced case (all processing times are equal). We present a conjecture which giv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2016

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2016.07.641