منابع مشابه
The Batch Loading and Scheduling Problem
This paper discusses a problem that commonly occurs in the batching and schedulingof certainkinds of batch processors. Examplesof these processors include heat treatment facilities, particularly in the steeland ceramicindustries as well as a varietyof operations in the manufacture of integratedcircuits. There are a set of jobs waiting to be processed. The processing time for a batchdependsonly ...
متن کاملThe Loading Time Scheduling Problem
In this paper we study precedence constrained scheduling problems, where the tasks can only be executed on a speciied subset of the machines. Each machine has a loading time that is incurred only for the rst task that is scheduled on the machine in a particular run. This basic scheduling problem arises in the context of machining on numerically controlled machines , query optimization in databa...
متن کاملThe Loading Time Scheduling Problem 1
In this paper we study precedence constrained scheduling problems, where the tasks can only be executed on a speci ed subset of the machines. Each machine has a loading time that is incurred only for the rst task that is scheduled on the machine in a particular run. This basic scheduling problem arises in the context of machining on numerically controlled machines, query optimization in databas...
متن کاملOptimal algorithms for the batch scheduling problem in OBS networks
This paper introduces optimal batch scheduling algorithms for the problem of scheduling batches of bursts in optical burst switching networks. The problem is modelled as a job scheduling problem with identical machines. The consideration of previously scheduled bursts in the scheduling allows such modeling. Two optimal algorithms with polynomial time complexity are derived and evaluated. Result...
متن کاملA hybrid two-stage transportation and batch scheduling problem
We study the coordinated scheduling problem of hybrid batch production on a single batching machine and two-stage transportation connecting the production, where there is a crane available in the first-stage transportation that transports jobs from the warehouse to the machine and there is a vehicle available in the second-stage transportation to deliver jobs from the machine to the customer. A...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Operations Research
سال: 2001
ISSN: 0030-364X,1526-5463
DOI: 10.1287/opre.49.1.52.11189