The awareness of integrated project delivery and building information modelling - facilitating construction projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Implementation of Integrated Project Delivery and Building Information Modeling on a Small Commercial Project

Integrated Project Delivery (IPD) seeks to improve project outcomes through a collaborative approach of aligning the incentives and goals of the project team through shared risk and reward, early involvement of all parties, and a multi-party agreement. The coupling of Building Information Modeling (BIM) with IPD enables a level of collaboration that not only improves efficiency and reduces erro...

متن کامل

Lean Construction, Building Information Modelling and Sustainability

This paper investigates the mutual relations of three current drivers of construction: lean construction, building information modelling and sustainability. These drivers are based on infrequently occurring changes, only incidentally simultaneous, in their respective domains. It is contended that the drivers are mutually supportive and thus synergistic. They are aligned in the sense that all re...

متن کامل

Building Information Modelling ( Bim ) Implementation and Remote Construction Projects : Issues , Challenges , and Critiques

The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique ...

متن کامل

construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers

the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...

Building Information Modelling: an Innovative Way to Manage Risk in Construction Projects

Background. Building Information Modelling (BIM) has been recently one of the most common issues discussed in publications related to innovative changes in the management of construction projects. The concept of BIM integrates all the activities related to the design, construction and operation into the ICT model developed and implemented within a communication platform. From the point of view ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Sustainable Development and Planning

سال: 2018

ISSN: 1743-7601,1743-761X

DOI: 10.2495/sdp-v13-n1-121-129