The "at risk" register: a statistical evaluation.
نویسندگان
چکیده
منابع مشابه
The "at risk" register: a statistical evaluation.
In the past decade there has been considerable discussion about the policy of the early selective screening of children at high risk of suffering from handicapping conditions which are not apparent at birth. This policy was advocated by Lindon (1961) and Sheridan (1962), who felt that universal screening of all infants was not practicable at that time. Sheridan in particular considered that it ...
متن کاملStatistical Evaluation of Induced Seismicity at the Karkheh Dam, Iran
Karkheh Dam is the largest dam in Iran with a capacity of about 7.4×109 cubic meters and height of 127 meters. Since the first impoundment, increasing in seismic activity in the dam area has been observed that indicates the possible occurrence of reservoir-induced seismicity (RIS).In the present work, a preliminary evaluation is conducted firstly in order to investigate these observations. Base...
متن کاملconditional copula-garch methods for value at risk of portfolio: the case of tehran stock exchange market
ارزش در معرض ریسک یکی از مهمترین معیارهای اندازه گیری ریسک در بنگاه های اقتصادی می باشد. برآورد دقیق ارزش در معرض ریسک موضوع بسیارمهمی می باشد و انحراف از آن می تواند موجب ورشکستگی و یا عدم تخصیص بهینه منابع یک بنگاه گردد. هدف اصلی این مطالعه بررسی کارایی روش copula-garch شرطی در برآورد ارزش در معرض ریسک پرتفویی متشکل از دو سهام می باشد و ارزش در معرض ریسک بدست آمده با روشهای سنتی برآورد ارزش د...
A Dosimetric Evaluation of Organs at Risk in Prostate Radiation Therapy using a MAGIC Gel Dosimeter
Introduction: Multiple fields and presence of heterogeneities create complex dose distributions that need three dimensional dosimetry. In this work, we investigated MR-based MAGIC gel dosimetry as a three-dimensional dosimetry technique to measure the delivered dose to bladder and rectum in prostate radiation therapy. Materials and Methods: A heterogeneous slab phantom including bones was made....
متن کاملEvaluation Approaches of Value at Risk for Tehran Stock Exchange
The purpose of this study is estimation of daily Value at Risk (VaR) for total index of Tehran Stock Exchange using parametric, nonparametric and semi-parametric approaches. Conditional and unconditional coverage backtesting are used for evaluating the accuracy of calculated VaR and also to compare the performance of mentioned approaches. In most cases, based on backtesting statistics Results, ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Epidemiology & Community Health
سال: 1970
ISSN: 0143-005X
DOI: 10.1136/jech.24.3.129