Testing of used cableway components before re-installing these railways

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Installing and Testing a Server Operating System

The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain. The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server. First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed proble...

متن کامل

Building and Installing a Hadoop/MapReduce Cluster from Commodity Components

This tutorial presents a recipe for the construction of a compute cluster for processing large volumes of data, using cheap, easily available personal computer hardware (Intel/AMD based PCs) and freely available open source software (Ubuntu Linux, Apache Hadoop). Introduction This article describes a straightforward way to build, install and operate a compute cluster from commodity hardware. A ...

متن کامل

Re-scheduling in railways: the Rolling Stock Balancing Problem

This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a timetable and a rolling stock schedule where the allocation of the rolling stock among the stations does n...

متن کامل

Assembling, Testing and Installing the Spiral2 Superconducting Linac

Assembly and tests of the SPIRAL2 superconducting linac's components are now proceeding smoothly. Cryomodules are being processed in CEA Saclay and IPN Orsay, inter-cryomodules "warm" sections in GANIL. While installation of the accelerators components is going on in the new SPIRAL2 building in Caen, installation of the cryomodules will begin during the last quarter of 2013. The latest results ...

متن کامل

Testing Components

Our goal is to investigate specification-based approaches to testing OO components. That is, given a class C and its specification, how do we test C to see if it meets its specification? Two important requirements that we impose on the testing approach are that it must not require access to the source code of the class under test; and that it should enable us to deal incrementally with derived ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transportation Overview - Przeglad Komunikacyjny

سال: 2017

ISSN: 2544-6037,0033-2232

DOI: 10.35117/a_eng_17_03_04