منابع مشابه
Assumptions in Economic Theory
Your use of the JSTOR archive indicates your acceptance of JSTOR's Terms and Conditions of Use, available at http://www.jstor.org/page/info/about/policies/terms.jsp. JSTOR's Terms and Conditions of Use provides, in part, that unless you have obtained prior permission, you may not download an entire issue of a journal or multiple copies of articles, and you may use content in the JSTOR archive o...
متن کاملSustainable Housing Techno-Economic Feasibility Application
The high prices currently achieved in the acquisition of nonrenewable energy for electricity production and the low levels of energy efficiency in the housing sector are the national situation, which leads the Portuguese government to encourage the acquisition, the installation and the use of technologies which exploit indigenous and renewable energy. This study presents an application that was...
متن کاملTechno-economic analysis of hybrid layered manufacturing
Subtractive manufacturing (CNC machining) has high quality of geometric and material properties but is slow, costly and infeasible in some cases; additive manufacturing (RP) is just the opposite. Total automation and hence speed is achieved in RP by compromising on quality. Hybrid Layered Manufacturing (HLM) developed at IIT Bombay combines the best features of both these approaches. It uses ar...
متن کاملTechnological revolutions and techno-economic paradigms
This paper locates the notion of technological revolutions in the NeoSchumpeterian effort to understand innovation and to identify the regularities, continuities and discontinuities in the process of innovation. It looks at the microand meso-foundations of the patterns observed in the evolution of technical change and the interrelations with the context that shape the rhythm and direction of in...
متن کاملTechno-Economic Analysis of Hydrokinetic Turbines
In small-scale hydropower scheme, the most important component is electro-mechanical equipment. Since cost contribution of this component is high because hydrokinetic projects require negligible civil works. Turbine and alternator contribute a major fraction of the hydrokinetic projects. Thus, there is a requirement to estimates the electromechanical equipment cost for a hydrokinetic hydropower...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Science as Culture
سال: 2017
ISSN: 0950-5431,1470-1189
DOI: 10.1080/09505431.2017.1377389