Technical Note—Expected Completion Time in Pert Networks

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Lower Bound for Completion Time Distribution Function of Stochastic PERT Networks

In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of...

متن کامل

A New Lower Bound for Completion Time Distribution Function of Stochastic PERT Networks

In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of...

متن کامل

A New Approach to Approximate Completion Time Distribution Function of Stochastic Pert Networks

The classical PERT approach uses the path with the largest expected duration as the critical path to estimate the probability of completing a network by a given deadline. However, in general, such a path is not the most critical path (MCP) and does not have the smallest estimate for the probability of completion time. The main idea of this paper is derived from the domination structure between ...

متن کامل

Fuzzy completion time for alternative stochastic networks

In this paper a network comprising alternative branching nodes with probabilistic outcomes is considered. In other words, network nodes are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of network. Then, it is assumed that the duration of activities is positive trapezoidal fuzzy number (TFN). This paper com...

متن کامل

A Study of Approximating the Moments of the Job Completion Time in PERT Networks

Executive Summary The importance of proper management of projects has not gone unrecognized in industry and academia. Consequently, tools like the Critical Path Method (CPM) and the Program Evaluation Review Technique (PERT) for project planning have been the focus of attention of both practitioners and researchers. Determination of the T ime to C omplete the J ob (TCJ) in PERT networks is impo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations Research

سال: 1976

ISSN: 0030-364X,1526-5463

DOI: 10.1287/opre.24.1.177