Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap
نویسندگان
چکیده
منابع مشابه
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملLocal search for nonpreemptive multi-mode resource-constrained project scheduling
This paper addresses a general class of nonpreemptive resource-constrained project scheduling problems in which activity durations are discrete functions of committed renewable and nonrenewable resources. We provide a well known 0±1 problem formulation and stress the importance of themodel by giving applications within production and operationsmanagement. Furthermore, we prove that the feasibil...
متن کاملthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
متن کاملA Local Search Approach to the Resource Constrained Project Scheduling Problem to Minimize Convex Costs
As the resource constrained project scheduling problem (RCPSP) has a wide range of applications, its models, extensions and algorithms have been intensively studied [2]. As for objective functions, makespan minimization has commonly been used, while the importance of non-regular ones such as earliness-tardiness are also recognized. In this paper, we introduce a time-lag cost, which is charged a...
متن کاملA Preemptive multimode resource constrained project scheduling model with cash flows
Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Industrial & Management Optimization
سال: 2021
ISSN: 1553-166X
DOI: 10.3934/jimo.2020077