Supply Chain Management of Alcoholic Beverage Industry Warehouse with Permissible Delay in Payments using Particle Swarm Optimization

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Two-warehouse Inventory Model with Linearly Time Varying Demand under Permissible Delay in Payments

As a matter of fact, the capacity of any warehouse is limited, so a firm has to hire a warehouse called rented warehouse (RW) for storing the excess units over the fixed capacity W (say) of the own warehouse (OW). Practically the RW is assumed to offer better storing facilities than the OW, which results in a lower rate of deterioration and is supposed to charge higher holding cost than the OW....

متن کامل

Lot sizing with permissible delay in payments and entropy cost

Although the lot size problem (i.e., the economic order quantity model) has been widely accepted and used by researchers and practitioners, it has also been criticized by others on the grounds that not accounting for some of the hidden costs in inventory systems often lead to poor results. This paper postulates that estimating these hidden costs may be attained by applying the first and second ...

متن کامل

A three-layer supply chain integrated production-inventory model under permissible delay in payments in uncertain environments

In this paper, an integrated production-inventory model is presented for a supplier, manufacturer, and retailer supply chain under conditionally permissible delay in payments in uncertain environments. The supplier produces the item at a certain rate, which is a decision variable, and purchases the item to the manufacturer. The manufacturer has also purchased and produced the item in a finite r...

متن کامل

Constrained Particle Swarm Optimization of Supply Chains

Since supply chains highly impact the financial performance of companies, it is important to optimize and analyze their Key Performance Indicators (KPI). The synergistic combination of Particle Swarm Optimization (PSO) and Monte Carlo simulation is applied to determine the optimal reorder point of warehouses in supply chains. The goal of the optimization is the minimization of the objective fun...

متن کامل

An Inventory Model for Obsolescence Items with Consideration of Permissible Delay in Payments (Case Study of Obsolete Medicines in Pharmacies)

Background and Objectives: In the real world, the obsolescence items are some items that lose their value over time due to the emergence of new technology. Because of rapid changes in technology, inventory management of such items is considered in recent years. Moreover, suppliers try to encourage the retailers for purchasing an item before it is outmoded with some policies suc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology

سال: 2019

ISSN: 2321-9653

DOI: 10.22214/ijraset.2019.8071