Supply Chain Logistics in Multi-Level Just-in-Time Production Sequencing Problems

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Just-In-Time Logistics in the Supply of Building Materials

Normally building materials are transported to the building site as a part of the purchase, and the price quoted is 'as delivered in whole truckloads'. This tempts the purchase organization to save a few cents, which are easily lost by an unsuitably form of delivery. Studies of logistics show that a substantial increase in productivity can be obtained by delivering building materials on conditi...

متن کامل

A REVIEW ON SEQUENCING APPROACHES FOR MIXED-MODEL JUST-IN-TIME PRODUCTION SYSTEM

Research interests have been focused on the concept of penalizing jobs both for being early and for being tardy because not only of modern competitive industrial challenges of providing a variety of products at a very low cost by smoothing productions but also of its increasing and exciting computer applications. Here, sequencing approaches of the mixed- model just-in-time production systems is...

متن کامل

Supply chain scheduling: Just-in-time environment

We study the benefits of coordinated decision making in a supply chain consisting of a manufacturer, a distributor, and several retailers. The distributor bundles finished goods produced by the manufacturer and delivers them to the retailers to meet their demands. The distributor is responsible for managing finished goods inventory. An optimal production schedule of the manufacturer, if imposed...

متن کامل

Enhancing Basic Metal Industry Global Competitiveness Through Total Quality Management, Supply Chain Management & Just- In -Time

The selection and implantation of sufficient and appropriate continuous improvement strategy are the key success factors for improving firm performance and enhancement of competitive advantage on manufacturing industries. As a result special role are given to Continuous improvement programs such as Supply Chain Management (SCM), Six-Sigma, Total Quality Management (TQM), Kaizen, Just-in-Time (J...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Institute of Engineering

سال: 2016

ISSN: 1810-3383

DOI: 10.3126/jie.v11i1.14700