Supply Chain Logistics in Multi-Level Just-in-Time Production Sequencing Problems
نویسندگان
چکیده
منابع مشابه
Just-In-Time Logistics in the Supply of Building Materials
Normally building materials are transported to the building site as a part of the purchase, and the price quoted is 'as delivered in whole truckloads'. This tempts the purchase organization to save a few cents, which are easily lost by an unsuitably form of delivery. Studies of logistics show that a substantial increase in productivity can be obtained by delivering building materials on conditi...
متن کاملA REVIEW ON SEQUENCING APPROACHES FOR MIXED-MODEL JUST-IN-TIME PRODUCTION SYSTEM
Research interests have been focused on the concept of penalizing jobs both for being early and for being tardy because not only of modern competitive industrial challenges of providing a variety of products at a very low cost by smoothing productions but also of its increasing and exciting computer applications. Here, sequencing approaches of the mixed- model just-in-time production systems is...
متن کاملSupply chain scheduling: Just-in-time environment
We study the benefits of coordinated decision making in a supply chain consisting of a manufacturer, a distributor, and several retailers. The distributor bundles finished goods produced by the manufacturer and delivers them to the retailers to meet their demands. The distributor is responsible for managing finished goods inventory. An optimal production schedule of the manufacturer, if imposed...
متن کاملEnhancing Basic Metal Industry Global Competitiveness Through Total Quality Management, Supply Chain Management & Just- In -Time
The selection and implantation of sufficient and appropriate continuous improvement strategy are the key success factors for improving firm performance and enhancement of competitive advantage on manufacturing industries. As a result special role are given to Continuous improvement programs such as Supply Chain Management (SCM), Six-Sigma, Total Quality Management (TQM), Kaizen, Just-in-Time (J...
متن کاملA Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production
In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Institute of Engineering
سال: 2016
ISSN: 1810-3383
DOI: 10.3126/jie.v11i1.14700