Sunset Company: Risk Analysis For Capital Budgeting Using Simulation And Binary Linear Programming

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modelling Stochastic Political Risk for Capital Budgeting

In this paper we model political risk for international capital budgeting as the value of a hypothetical insurance policy that pays the holder any and all losses arising from political events. We address three important aspects of political risk that are widely acknowledged in the literature but either missing or incomplete in existing mathematical models: 1) loss causing political events arise...

متن کامل

Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects

Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...

متن کامل

Capital budgeting: A data envelopment analysis approach

Budget allocation is a common task carried in our daily life. As it seems to be necessary to perform this task in an ideal manner this paper mainly deals with budget allocation problem. The main key feature of this work is that it uses a mathematical programming technique Data Envelopment Analysis (DEA) for formulating a proper model for capital budget allocation. This formulation is based on t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Business Case Studies (JBCS)

سال: 2011

ISSN: 2157-8826,1555-3353

DOI: 10.19030/jbcs.v4i3.4767