SUBCONTRACTOR SELECTION PRACTICES IN INTERNATIONAL CONSTRUCTION PROJECTS

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improved Construction Subcontractor Evaluation Performance Using ESIM

This article may be used for research, teaching, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any form to anyone is expressly forbidden. The publisher does not give any warranty express or implied or make any representation that the contents will be complete or accurate or up to date...

متن کامل

Social Network Analysis of Collaborative Entries for Construction Firms in International Construction Projects

The current global construction market is growing tremendously largely due to globalization of world construction markets, rapid development of world-wide communication technologies, extensions of regional Free Trade Blocks, just to name a few. Korean companies, in search for a growth from the recession of domestic construction market, have expanded into the globalized market over the last deca...

متن کامل

Investigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects

Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...

متن کامل

Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach

An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...

متن کامل

Automated Processing of Subcontractor Work Performance Data to Improve the Quality Control and Support the Subcontractor Selection Process

The paper presents the research aimed to find the way for efficient monitoring and control of subcontractor performance in large construction projects. As a result the procedure for recording and processing the nonconformities is proposed. Procedure consists of the following stages: the identification of nonconformity (defect, work performed is at variance with project, the requirements of work...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT

سال: 2010

ISSN: 1392-3730,1822-3605

DOI: 10.3846/jcem.2010.04