Studying on a Genetic-Simulation Optimization Algorithm Method for Steel Crane Scheduling Problem

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Genetic Algorithm Developed for a Supply Chain Scheduling Problem

This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...

متن کامل

A simulation-based immune genetic algorithm for the crane scheduling problem

The paper studied a multi-machine and multi-task warehouse crane scheduling problem. The collision between adjacent cranes needs to be avoided in the scheduling problem. Considering the involved operation requirement and condition, a process simulation model was formulated to evaluate a candidate crane schedule through rehearsing the crane operation process. Based on the process simulation, an ...

متن کامل

Yard crane scheduling in port container terminals using genetic algorithm

Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...

متن کامل

Train Scheduling Problem - Phase II: A Simulation Integrated Genetic AlgorithmSystem

In [1] a feasible timetable generator stochastic simulation modeling framework for the train scheduling problem was developed to obtain a train timetable which includes train arrival and departure times at all visited stations and calculated average train travel time for all trains in the system. In this study, the framework is integrated with a genetic algorithm (GA) in order to get an optimal...

متن کامل

A Branch-and-Cut algorithm for factory crane scheduling problem

The factory crane scheduling problem (FCSP) deals with assigning delivery tasks to cranes and then sequencing them, in order to minimize the total completion time for all tasks. In this paper, delivery tasks for required jobs are preemptive allowed at most once before the jobs arrive at exit. The preemptive jobs are temporarily stored in a buffer stack, in which jobs pickup and delivery should ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Science Innovation

سال: 2016

ISSN: 2328-7861

DOI: 10.11648/j.si.20160406.17