Study On Waste Water Treatment Installation And Its Electricity Distribution
نویسندگان
چکیده
Hospital wastewater is a source of pollutants for the environment that can have negative impact. waste contain various kinds microorganisms depending on type hospital and level treatment carried out after disposed of. Therefore, it necessary to conduct study Wastewater Treatment Plants so discharged meets requirements from hospital. From results this be concluded initial process final check quality determine efficiency at least 2 times year. The Domestic WWTP engineering design are capacity 150 m3 per day, BOD average 300 mg / l, SS concentration total processing 90-95%, treated water 20 l by l. Meanwhile, distribution electric power in form MCB 1 phase 6 Amp - 220 Volt with 1122 watts which used supply unit 250 recycler pumps 4 units air blower 800 or requirement 1050 watts. Whereas 3 32 380 17,902,478 watts, 10 pump collecting tubs 3500 350 3,850 It recommended fat filter tub transported every day grease other impurities do not accumulate., sewage pipe found leaks should repaired immediately there need fish control functions as medium an indicator going well.
منابع مشابه
A Study on removal of chromium from tannery effluent treatment of chrome tanning waste water using tannery solid waste
This study illustrates the process of removal of chromium from chrome tanning waste-water by fly ash which was drive from chrome shaving dust. This experiment was carried out in a batch process with laboratory prepared adsorbent samples and chrome tanning water collected from local tanneries. The influence of various factors likes adsorbent doses, contact time, and initial concentration of chro...
متن کاملTreatment of Textile Waste Water with Organoclay
In this study a sample of bentonite obtained from Semnan mines, was modified by a surfactant to prepare an organoclay with high surface area. BET analysis showed that the modification increased its surface significantly. The prepared sorbent was used for removal of dyes and other organic pollutants from a waste water obtained from Ekbatan textile company. Adsorption was studied in ...
متن کاملthe study of practical and theoretical foundation of credit risk and its coverage
پس از بررسی هر کدام از فاکتورهای نوع صنعت, نوع ضمانت نامه, نرخ بهره , نرخ تورم, ریسک اعتباری کشورها, کارمزد, ریکاوری, gdp, پوشش و وثیقه بر ریسک اعتباری صندوق ضمانت صادرات ایران مشخص گردید که همه فاکتورها به استثنای ریسک اعتباری کشورها و کارمزد بقیه فاکتورها رابطه معناداری با ریسک اعتباری دارند در ضمن نرخ بهره , نرخ تورم, ریکاوری, و نوع صنعت و ریسک کشورها اثر عکس روی ریسک اعتباری داردو پوشش, وثی...
15 صفحه اولWaste on the roadside, 'poi-sute' waste: its distribution and elution potential of pollutants into environment.
Waste on the roadside, 'poi-sute' waste, was collected in a typical suburb in Japan (Ueda city, the sampling course: 3.2 km). The distribution, characterization of the 'poi-sute' waste and the loading of pollutants from the waste were studied. The average number of pieces of total waste was 690 pieces a month, and 220 pieces of waste were dumped a month per km. There was a tendency for much was...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Jurnal Teknik Elektro dan Komputasi
سال: 2021
ISSN: ['2685-1814', '2685-7677']
DOI: https://doi.org/10.32528/elkom.v3i1.4501