Study on Optimization of Coal Truck Flow in Open-Pit Mine
نویسندگان
چکیده
منابع مشابه
Development of a goal programming model for optimization of truck allocation in open pit mines
Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...
متن کاملA Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine
One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...
متن کاملSwarm –Based Truck-Shovel Dispatching System in Open Pit Mine Operations
The dispatch of trucks and shovel has always been an important component in the success of open pit mine operations. Dispatch systems have evolved from manual to today automatic with almost no human intervention. Although dispatching systems available today are “pseudo real time” and efficient, the optimal dispatching is realized over subsets of the fleet when dealing with large fleets. This ap...
متن کاملAnalyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran
Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in Civil Engineering
سال: 2020
ISSN: 1687-8086,1687-8094
DOI: 10.1155/2020/8848140