Study on Multiprojecting Method for Targeting Low-cost Construction Project through Cooperation of Land Development Project Management
نویسندگان
چکیده
منابع مشابه
Information Technology for Project Cost Management (Case study: Soufian Cement Co, Iran)
In today's competitive world, reduction of production costs has become one of the corporates priorities. Survival triangle (cost, quality and time) is the solution that helps companies focus on these three dimensions and have the ability to compete with other companies. Cost management is the first step in this way that providing solutions and advice to managers who need help to have a precise ...
متن کاملProject Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملDevelopment of a National Mega Research Project on the Integrated Watershed Management for Iran
متن کامل
Agile Construction Project Management
Project management in the information systems industry has had a poor record of delivering value and has consequently seized upon the recent evolutional of agile project management. What is meant by agile project management, from whence it originated and whether it has further applicability are not widely understood. The construction industry also has a less than perfect project management reco...
متن کاملA Systems Dynamics Model for Project Management systems of Project-Based Organization
It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Construction Management, JSCE
سال: 1997
ISSN: 1884-8311
DOI: 10.2208/procm.5.211