STUDY ON KNOWLEDG-INTENSIVE SCHEDULING METHOD FOR CONSTRUCTION PLANNING

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

A Hybrid Method for Planning and Scheduling

We combine mixed integer linear programming (MILP) and constraint programming (CP) to solve planning and scheduling problems. Tasks are allocated to facilities using MILP and scheduled using CP, and the two are linked via logic-based Benders decomposition. Tasks assigned to a facility may run in parallel subject to resource constraints (cumulative scheduling). We solve minimum cost problems, as...

متن کامل

Assumption-Based Planning: Generating Plans and Explanations under Incomplete Knowledg

Many practical planning problems necessitate the generation of a plan under incomplete information about the state of the world. In this paper we propose the notion of AssumptionBased Planning. Unlike conformant planning, which attempts to find a plan under all possible completions of the initial state, an assumption-based plan supports the assertion of additional assumptions about the state of...

متن کامل

Axiomatic-design Scheduling Method for Fast-track Construction

The fast-tracking delivery method has received considerable attention over the last decade because of its time saving feature depending on overlapping of phases of a project. However, to implement the fast-tracking construction, not only the overlapping relationship between design and construction phases, but also the estimating the reduction of the construction duration is difficult to determi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: INFRASTRUCTURE PLANNING REVIEW

سال: 1989

ISSN: 0913-4034,1884-8303

DOI: 10.2208/journalip.7.59