Aiming at the problems of difficult support mining roadway under goaf close distance coal seam, obvious large deformation, and long-term continuous deformation surrounding rock, an advanced bolt-grouting system is proposed. The can effectively solve problem from design system, construction monitoring evaluation realize intelligent support. Based on actual engineering background 29204 working face in Dongqu Coal Mine, supporting material scheme, grouting parameters, technology are studied analyzed. Finally, scheme adjusted optimized timely by combining with anchor grouting. field practice results show that bolting-grouting has good applicability to different conditions. maximum subsidence roof test section reduced 73.48 % compared original stress cable 50.68 %. research provide a set safe effective feasible technical ideas methods rock control seam.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Numerical Study on 4-1 Coal Seam of Xiaoming Mine in Ascending Mining

Coal seams ascending mining technology is very significant, since it influences the safety production and the liberation of dull coal, speeds up the construction of energy, improves the stability of stope, and reduces or avoids deep hard rock mining induced mine disaster. Combined with the Xiaoming ascending mining mine 4-1, by numerical calculation, the paper analyses ascending mining 4-1 fact...

متن کامل

Reduction of Stress Acting on a Thick, Deep Coal Seam by Protective-Seam Mining

Aiming to reduce the high mining stress observed in large-space roof structures during mechanized mining of thick coal seams, a control technique based on protective-seam mining is proposed. This technique was used to investigate the 8108 working face of the No. 3–5 thick coal seam of the Tashan mine located in the Datong area of Shanxi, China, by means of simulations and field measurements. Th...

متن کامل

Extraction of Pressurized Gas in Low Air-Conductivity Coal Seam Using Drainage Roadway

A drainage roadway was constructed in the fractured zone beside an air-return roadway of a mining site. However, drainage roadways serve only one working face and are discarded after mining, thus weakening sustainable mining practices. To improve the sustainability at mining sites, this paper proposes a new drainage roadway that can serve two adjacent working faces. A schematic layout of the pr...

متن کامل

Extension of Excavation Damaged Zone Due to Longwall Working Effect

In advance longwall mining, the safety of mine network, production rate, and consequently, economic conditions of a mine are dependent on the stability conditions of gate roadways. The gate roadway stability is a function of two important factors: 1) characteristics of the excavation damaged zone (EDZ) above the gate roadway and 2) loading effect due to the caving zone (CZ) above the longwall w...

متن کامل

Permeability Prediction in Deep Coal Seam: A Case Study on the No. 3 Coal Seam of the Southern Qinshui Basin in China

The coal permeability is an important parameter in mine methane control and coal bed methane (CBM) exploitation, which determines the practicability of methane extraction. Permeability prediction in deep coal seam plays a significant role in evaluating the practicability of CBM exploitation. The coal permeability depends on the coal fractures controlled by strata stress, gas pressure, and strat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: E3S web of conferences

سال: 2022

ISSN: ['2555-0403', '2267-1242']

DOI: https://doi.org/10.1051/e3sconf/202235801033