Structural Integrity Evaluation of Generator Retaining Ring at Dieng Geothermal Power Plant

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Earthquake Evaluation of the Non Structural Elements in a Thermal Power Plant

Non Structural elements such as mechanical, electrical and architectural elements always posses serious damage potentials during earthquakes. Degree of damage imposed by the non structural elements is not usually measured by the physical damages caused, but more so by the amount of the economical and functional disruptions created in a built environment. This phenomenon is enhanced where the fu...

متن کامل

MW Geothermal Power Plant Multiple Simulator , Using Wireless Technology

A geothermal power plant multiple simulator for operators training is presented. The simulator is designed to be installed in a wireless local area network and has a capacity to train one to six operators simultaneously, each one with an independent simulation session. The sessions must be supervised only by one instructor. The main parts of this multiple simulator are: instructor and operator’...

متن کامل

Use of Slip Ring Induction Generator for Wind Power Generation

Wind energy is now firmly established as a mature technology for electricity generation. There are different types of generators that can be used for wind energy generation, among which Slip ring Induction generator proves to be more advantageous. To analyse application of Slip ring Induction generator for wind power generation, an experimental model is developed and results

متن کامل

110 MW Geothermal Power Plant Multiple Simulator, Using Wireless Technology

A geothermal power plant multiple simulator for operators training is presented. The simulator is designed to be installed in a wireless local area network and has a capacity to train one to six operators simultaneously, each one with an independent simulation session. The sessions must be supervised only by one instructor. The main parts of this multiple simulator are: instructor and operator’...

متن کامل

evaluation of geothermal power plants development:an environmental economics perspective

in the sector of electricity production, the existence of investment resources limitation and environmental factors are the main factors that influence this process. the reduction of costs and the destructive impacts of environmental have been always mentioned by specialists. consequently, the drasticality of the environmental protection and the electric-energy production lead to focus on solar...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Clean Energy Technologies

سال: 2015

ISSN: 1793-821X

DOI: 10.7763/jocet.2015.v3.241