Stochastic Pricing and Order Model with Transportation Mode Selection for Low-Carbon Retailers
نویسندگان
چکیده
منابع مشابه
A stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملCompetitive Delivered Pricing by Mail-Order and Internet Retailers
Mail-order and internet sellers must decide how customers pay shipping charges. Typically, these sellers choose between two pricing policies: either “uniform pricing,” where the firm delivers to any customer at a fixed delivery charge (that may be volume dependent), or “mill pricing,” where the firm bills the customer a distance-related shipping charge. This paper studies price competition betw...
متن کاملLow-Order Stochastic Mode Reduction for a Prototype Atmospheric GCM
This study applies a systematic strategy for stochastic modeling of atmospheric low-frequency variability to a three-layer quasigeostrophic model. This model climate has reasonable approximations of the North Atlantic Oscillation (NAO) and Pacific–North America (PNA) patterns. The systematic strategy consists first of the identification of slowly evolving climate modes and faster evolving noncl...
متن کاملLow-order stochastic mode reduction for a realistic barotropic model climate
This study applies a systematic strategy for stochastic modeling of atmospheric lowfrequency variability to a realistic barotropic model climate. This barotropic model climate has reasonable approximations of the Arctic Oscillation (AO) and Pacific/North America (PNA) teleconnections as its two leading principal patterns of low-frequency variability. The systematic strategy consists first of th...
متن کاملa stochastic model for project selection and scheduling problem
resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. in this study, budget, investment costs and earnings are considered to be stochastic. the objectives are maximizing net present values of selected projects and minimizing v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2016
ISSN: 2071-1050
DOI: 10.3390/su8010048