Stochastic integrated vendor–buyer model with unstable lead time and setup cost
نویسندگان
چکیده
منابع مشابه
An Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items
In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...
متن کاملPeriodic inventory model with unstable lead-time and setup cost with backorder discount
The main purpose of this study is to investigate the periodic inventory model with backorder price discounts, where shortages are partially backlogged. The application of just-in-time (JIT) philosophy i.e., crashing of the lead-time and setup cost has been carried component wise. Two cases have been discussed viz 1 protection interval demand distribution is known (normal distribution approach) ...
متن کاملan integrated inventory model with controllable lead time and setup cost reduction for defective and non-defective items
in this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. the cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. lead time is an important element in any inventory system. the proposed model is presents an integrated inventory model with controllable lead tim...
متن کاملAn integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production
In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...
متن کاملSetup Cost and Lead Time Reductions on Stochastic Inventory Models with a Service Level Constraint
The stochastic inventory models analyzed in this paper explore the problem of lead time associated with setup cost reductions for the continuous review and periodic review inventory models. For these two models with a mixture of backorders and lost sales, we respectively assume that their mean and variance of the lead time demand and protection interval (i.e., lead time plus review period) dema...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Industrial Engineering Computations
سال: 2011
ISSN: 1923-2926,1923-2934
DOI: 10.5267/j.ijiec.2010.06.001