Production planning is a necessary process that directly affects the efficiency of production systems in most industries. The complexity current problem depends on increased options production, uncertainties demand and resources. In this study, stochastic multi-objective mixed-integer optimization model developed to ensure uncertainty conditions satisfy requirements sustainable development. system ensured through objective functions optimize backorder quantity, machine uptime customer satisfaction. other three proposed are related profits, emissions, employment changing. respectively represent elements development: economy, environment, sociality. also assures manager’s discretion over whether or not adopt such as backorder, overtime, temporary workers. At same time, resource limits above can be adjusted according situation each facility via model’s parameters. solutions compromise determined with Chebyshev goal programming approach together weights goals. applied multinational Southeast Asian supplier textile industry. solution shows an improvement many aspects compared supplier’s manufacturing practices under conditions. Last but least, study develops different scenarios based random distributions between functions. analysis evaluation these provide reference basis for managers adjust situations. Analysis uncertain more complex well making predictions about effectiveness advantages learning considered future studies.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem

In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...

متن کامل

A mixed integer nonlinear programming model for optimizing a gas pipeline transmission linear network

The technical equipment developed and used in both installation and operation processes in refineries, oil and gas pipelines, and gas booster stations has always been expensive. Hence, managers at different organizational levels are keen to find methods to control and reduce these costs. Generally speaking, the operators in a gas booster station choose the operating devices without considering ...

متن کامل

A multi objective mixed integer programming model for design of a sustainable meat supply chain network

In the recent decades, rapid population growth has led to the significant increase in food demand. Food supply chain has always been one of the most important and challenging management issues. Product with short age, especially foodstuffs, is the most problematic challenges for supply chain management. These challenges are mainly due to the diversity in the number of these goods, the special n...

متن کامل

A Mixed Integer Linear Programming Model for the Design of Remanufacturing Closed–loop Supply Chain Network

Closed-loop supply chain network design is a critical issue due to its impact on both economic and environmental performances of the supply chain. In this paper, we address the problem of designing a multi-echelon, multi-product and capacitated closed-loop supply chain network. First, a mixed-integer linear programming formulation is developed to maximize the total profit. The main contribution...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematics

سال: 2021

ISSN: ['2227-7390']

DOI: https://doi.org/10.3390/math9050483