منابع مشابه
On Scheduling Two-Stage Jobs on Multiple Two-Stage Flowshops
Motivated by the current research in data centers and cloud computing, we study the problem of scheduling a set of two-stage jobs on multiple two-stage flowshops. A new formulation for configurations of such scheduling is proposed, which leads directly to improvements to the complexity of scheduling algorithms for the problem. Motivated by the observation that the costs of the two stages can be...
متن کاملHolding onto power: why confidence intervals are not (usually) the best basis for sample size calculations
Results With a little simplification, the sample size calculations for the traditional power-based approach, for equivalence studies, and following the new proposal can be shown to be much the same. The single fundamental difference is that the new proposal does not include a multiplier to increase the statistical power beyond 50% (i.e. only a 50:50 chance of detecting a true treatment effect o...
متن کامل"Good jobs" to "bad jobs": replicated evidence of an employment continuum from two large surveys.
The goal of this study was to offer an expanded conceptualization of the employment continuum and test its utility by examining the association of different employment statuses with physical health and depression. Using data from two large cross-sectional surveys we develop five different employment categories (i.e., "optimal", "economically good", "psychologically good", "barely adequate", and...
متن کاملScrew-holding Capacity of Two Furniture-grade Plywoods
niture-grade plywood. The information is greatly needed for manufacturing, buyUltimate screw withdrawal loads (USWLs) from panel face and edge of furnitureing and selling plywood panels, and for grade southern pine (Pinus spp.) and sweetgum (Liquidambar styraeiflua L.) plywood better construction of ]plywood joints in were evaluated at five moisture contents (MCs). Both face and edge USWL decre...
متن کاملMinimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop
[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Science
سال: 2006
ISSN: 0036-8075,1095-9203
DOI: 10.1126/science.312.5770.22c