Staff scheduling for a courier distribution centre using evolutionary algorithm
نویسندگان
چکیده
Staff scheduling is a <span lang="EN-US">combinatorics optimization problem and companies face this complex task on daily basis in constructing schedule fitting all conditions. In courier distribution center, staffs are assigned to work processes of continuous workflow. Staffs have varying ability for each process. Instead generating staff instinctively, it an advantage optimize staff’s by measuring the performance staff. An optimized improves operation’s efficiency fully utilize staffs’ ability, hence, minimizing cost. This paper proposed evolutionary algorithm, namely genetic algorithm as solution center scheduling. Based result, produced can reduce up 30% while not affecting operation The cut down number working could amount substantial reduction cost every month. generated significantly customized take less time complete operation. Although specific use case however, potentially generalize model logistics industry, introducing more effective system cope with industry’s ever-rising demands.</span>
منابع مشابه
fault location in power distribution networks using matching algorithm
چکیده رساله/پایان نامه : تاکنون روشهای متعددی در ارتباط با مکان یابی خطا در شبکه انتقال ارائه شده است. استفاده مستقیم از این روشها در شبکه توزیع به دلایلی همچون وجود انشعابهای متعدد، غیر یکنواختی فیدرها (خطوط کابلی، خطوط هوایی، سطح مقطع متفاوت انشعاب ها و تنه اصلی فیدر)، نامتعادلی (عدم جابجا شدگی خطوط، بارهای تکفاز و سه فاز)، ثابت نبودن بار و اندازه گیری مقادیر ولتاژ و جریان فقط در ابتدای...
Staff Scheduling by a Genetic Algorithm
This paper describes a Genetic Algorithms approach to amanpower-scheduling problem arising at a Petrochemical Company. AlthoughGenetic Algorithms have been successfully used for similar problemsin the past, they always had to overcome the limitations of theclassical Genetic Algorithms paradigm in handling the conflict betweenobjectives and constraints. The approach taken here is to use an indir...
متن کاملAn Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm
In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...
متن کاملPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملNational Hockey League Scheduling Using a Multi-Objective Evolutionary Algorithm
The National Hockey League of North America is the premier ice hockey league in the world. It consists of 30 teams that play 82 games each a season, for a total of 1230 games across all teams. Determining a schedule for games is a very difficult task as there is a number of different, often conflicting factors that must be addressed, such as travel distance, fairness, and revenue. A multiobject...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Indonesian Journal of Electrical Engineering and Computer Science
سال: 2022
ISSN: ['2502-4752', '2502-4760']
DOI: https://doi.org/10.11591/ijeecs.v27.i2.pp1043-1050