Stable scheduling of single machine with probabilistic parameters
نویسندگان
چکیده
منابع مشابه
JIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملSingle-machine Scheduling with
This paper studies the single-machine scheduling problem with deteriorating jobs and learning considerations. The objective is to minimize the makespan. We first show that the schedule produced by the largest growth rate rule is unbounded for our model, although it is an optimal solution for the scheduling problem with deteriorating jobs and no learning. We then consider three special cases of ...
متن کاملMeta-heuristics for stable scheduling on a single machine
This paper presents a model for single-machine scheduling with stability objective and a common deadline. Job durations are uncertain, and our goal is to ensure that there is little deviation between planned and actual job starting times. We propose two meta-heuristics for solving an approximate formulation of the model that assumes that exactly one job is disrupted during schedule execution, a...
متن کاملSingle machine scheduling problems
In this paper, single machine scheduling problems with sequence dependent setup times are considered. The objective is to minimize the total weighted tardiness. The single machine total weighted tardiness (SMTWT) scheduling problems with sequence dependent setup times were proved to be strongly NP-hard. A recently developed meta-heuristic algorithm called as crow search algorithm is proposed to...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Bulletin of the Polish Academy of Sciences Technical Sciences
سال: 2017
ISSN: 2300-1917
DOI: 10.1515/bpasts-2017-0026