STABILITY OF BREAKWATER ROUNDHEADS DURING CONSTRUCTION
نویسندگان
چکیده
منابع مشابه
Artificial Intelligence and Rubble-Mound Breakwater Stability
Breakwaters are coastal structures constructed to shelter a harbour basin from waves. There are two main types: rubble-mound breakwaters, consisting of various layers of stones or concrete pieces of different sizes (weights), making up a porous mound; and vertical breakwaters, impermeable and monolythic, habitually composed of concrete caissons. This article deals with rubble-mound breakwaters....
متن کاملProbabilistic Neural Network for Predicting the Stability numbers of Breakwater Armor Blocks
Probabilistic Neural Network for Predicting the Stability numbers of Breakwater Armor Blocks Doo Kie Kim1, Dong Hyawn Kim2, Seong Kyu Chang1 and Sang Kil Chang1 Summary The stability numbers determining the Armor units are very important to design breakwaters, because armor units are designed for defending breakwaters from repeated wave loads. This study presents a probabilistic neural network ...
متن کاملAnalysis on Components Complexity During Execution of Construction Projects
Development is the fundamental area in enabling India`s economy and urban and provincial structure. Development is a multi-connected structure where all variables are bury connected and multi-centered. All the three limitations time, expense and quality ought to be adjusted in an improved way, so that no segment gets influenced by dismissing those. The goal of this study is to distinguish the m...
متن کاملdiscursive motivation/demotivation construction: a case of iranian efl majors
بررسی نقش گفتمان در شکل گیری یا کاهش انگیزش فراگیران زبان خارجی موضوع تحقیق نسبتاً جدیدی است. از این رو، تحقیقات کمی در این زمینه وجود دارد. به منظور پر کردن این خلاء ، مطالعه کنونی به بررسی فرآیند گفتمان مدار شکل گیری یا کاهش انگیزش دانشجویان ایرانی زبان انگلیسی پرداخت. نخست، این مطالعه به صورت آزمایشی با 7 نفر (? دانشجوی پسر و 5 دختر) از دانشجویان سال دوم دوره ی کارشناسی زبان و ادبیات انگلیسی ...
Environmental risk assessment of a dam during construction phase
The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Coastal Engineering Proceedings
سال: 2011
ISSN: 2156-1028,0589-087X
DOI: 10.9753/icce.v32.structures.33