Abstract Bener Dam Diversion Tunnel is located in two rock units such as andesite and breccia. Based on the engineering geology investigation, subsurface tunnel will penetrate breccia with good mass quality (fresh-moderately weathered), while surrounding consist of breccias moderate poor quality. Geological conditions are used basis for stability analysis excavation methods determining primary support systems. Strength Index parameters. The openings supports was carried out using an empirical numerical method approach. results system were then evaluated finite element method. most suitable applied by blasting. Evaluation based rating modeling shows that lowest safety score geomechanical zone 2 a factor value at final 1.786, however general they condition which safe from initial until installation stage.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...

متن کامل

Stability analysis of support systems using a coupled FEM-DFN model (Case study: a diversion tunnel at Lorestan dam site, Iran)

Various structural discontinuities, which form a discrete fracture network, play a significant role in the failure conditions and stability of the rock masses around underground excavations. Several continuum numerical methods have been used to study the stability of underground excavations in jointed rock masses but only few of them can take into account the influence of the pre-existing natur...

متن کامل

Monitoring of Cheragh-veis Dam During Construction Using Instrumentation Data and Investigation of dam behavior during impounding

One of the most important challenges in development projects beside designing and performing them is to control immunity and stability of the several parts during different stages of construction, impoundment, and operation.  The   main purpose of instrumentation in dams is to evaluate operation and reaction of these structures under different load conditions, developing a better understanding...

متن کامل

Dam Safety During Design, Construction and Operation

Introduction In the foreword to the Malaysian Guidelines for Operation, Maintenance and Surveillance of Dams (Malaysian Inter-Departmental Committee on Dam Safety 1989), it is stated “The expanding inventory of dams has brought into focus the subject of dam safety”. At the time of the guideline publication, there had been a considerable increase in the inventory of dams with those constructed d...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP conference series

سال: 2022

ISSN: ['1757-899X', '1757-8981']

DOI: https://doi.org/10.1088/1755-1315/1098/1/012017