SPATIO-TEMPORAL PROCESS SIMULATION OF DAM-BREAK FLOOD BASED ON SPH
نویسندگان
چکیده
منابع مشابه
A Mathematical Model for Forecasting the Dam-Break Flood Routing Process of a Landslide Dam
Once a landslide dam bursts, its reservoir discharges quickly in a flood which will cause catastrophic damage to life and property downstream. For a specific landslide dam, the peak flow rate and the evolution of downstream flood are influenced by the shape and size of the dike breach when dam-break occurs. According to the general nature of landslide dams and field observations of dike-breach ...
متن کاملExperimental Investigation of Flash Flood Resulting from Dam-Break on Bed Sediment Transport
Varied flows such as flooding resulting from dam break can happen due to earthquakes, seepage, bombing, overtopping, mistake in design and project performance as well as causing financial damages and human losses. Unsteady flow during flooding events has a high impact on flow field pattern, sediment motion, ecology and also, distribution of contamination in the river. In this study, the impact ...
متن کاملDam-break Flood Risk Management. an Integrated Project
Contemporary dam safety regulations include risk assessment at downstream flood plains and consideration of potential damages due to dam rupture, regardless of the expected probability of occurrence of such event. The aim of these kind of procedures is to increase the safety level along the valley against abnormal floods caused by dam accidents. Emergency plans for downstream flood plains, incl...
متن کاملSimulating Dam - Break Flooding with Floating Objects through Intricate City Layouts Using GPU - based SPH Method
For the fast transient dam break flooding with floating bodies presented through intricate city layouts, the traditional grid-based method based on solving two dimensional (2D) Shallow Water Equations or three dimensional (3D) Reynolds-averaged Navier-Stokes equations have difficulty in modelling the 3D unsteady flow features and the moving objects in the flow, causing inaccuracies. In this pap...
متن کاملEfficient dam break flood simulation methods for developing a preliminary evacuation plan after the Wenchuan Earthquake
The Xiaojiaqiao barrier lake, which was the second largest barrier lake formed by the Wenchuan Earthquake had seriously threatened the lives and property of the population downstream. The lake was finally dredged successfully on 7 June 2008. Because of the limited time available to conduct an inundation potential analysis and make an evacuation plan, barrier lake information extraction and real...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
سال: 2018
ISSN: 2194-9034
DOI: 10.5194/isprs-archives-xlii-3-1721-2018