Spatial Scheduling of Forest Management Activities using a Dynamic Deterministic Harvest Block Aggregation Process

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Harvest scheduling with spatial aggregation for two and three strip cut system under shelterwood management

We propose a spatial aggregation method to solve an optimal harvest scheduling problem for strip shelterwood management. Strip shelterwood management involves either a two-cut system with a preparatory-removal cut cycle, or a three-cut system with a preparatory-establishment-removal cut cycle. In this study we consider these connected sequential cuts as one decision variable, then employ conven...

متن کامل

Spatial Forest Harvest Scheduling for Areas Involving Carbon and Timber Management Goals

Forest carbon sequestration has become an important ecological service for human society. Given the widespread attention paid to global climate change over the last few decades, a potential need has arisen to develop forest management plans that integrate carbon management and other spatial and non-spatial goals. The objective of this research was to develop a spatial forest planning process by...

متن کامل

Imposing Connectivity Constraints in Forest Harvest Scheduling

Rodolfo Carvajal H. Milton Stewart School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA 30332, [email protected] Miguel Constantino Centro de Investigação Operacional, Lisboa, Portugal, [email protected] Marcos Goycoolea Escuela de Negocios, Universidad Adolfo Ibáñez, Santiago, Chile, [email protected] Juan Pablo Vielma Business Analytics ...

متن کامل

Promoting large, compact mature forest patches in harvest scheduling models

Spatially-explicit harvest scheduling models that can promote the development of dynamic mature forest patches have been proposed in the past. This paper introduces a formulation that extends these models by allowing the total perimeter of the patches to be constrained or minimized. Test run results suggest that the proposed model can produce solutions with fewer, larger, and more compact patch...

متن کامل

A Simulation Model for Spatial Scheduling of Dynamic Block Assembly in Shipbuilding

Accurately predicting the required spatial resource for aggregate block assembly in shipyard production is difficult due to the following reasons: 1) lack of optimal block on-jig configuration and 2) the dynamic and stochastic nature of production system. Consequently, managerial objectives are seldom achieved without effective production planning and control. In this study, a look-ahead schedu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Forest Planning

سال: 2003

ISSN: 1341-562X,2189-8316

DOI: 10.20659/jfp.9.1_25