Some Special Cases of a Continuous Time-Cost Tradeoff Problem with Multiple Milestones under a Chain Precedence Graph

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management

In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...

متن کامل

The stochastic time-cost tradeoff problem: A robust optimization approach

We consider the problem of allocating resources to projects performed under given due dates and stochastic time–cost tradeoff settings. In particular, we show how to implement a state-of-the-art methodology known as “robust optimization” to solve the problem. In contrast to conventional approaches, the model we develop results in management policies rather than optimal values for the original d...

متن کامل

A Time Dependent Pollution Routing Problem in Multi-graph

This paper considers a time dependent(the travel time is not constant throughout the day) pollution routing problem (TDPRP), which aids the decision makers in minimizing travel time, toll cost and emitted pollution cost.  In complexity of urban areas most of the time one point is accessible from another with more than one edge. In contrast to previous TDPRP models, which are designed with only ...

متن کامل

Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile

This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...

متن کامل

Project time–cost analysis under generalised precedence relations

Existing methods dealing with the time–cost trade-off problem, which is encountered in project planning, have focused on the solution of a basic problem that does not adequately represent actual engineering projects. The aim of this paper is to develop a solution method considering additional realistic project characteristics such as generalised activity precedence relations and external time c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Management Science and Financial Engineering

سال: 2016

ISSN: 2287-2043

DOI: 10.7737/msfe.2016.22.1.005