Some preemptive open shop scheduling problems with a renewable or a nonrenewable resource

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Some Preemptive open Shop Scheduling Problems with a Renewable or a Nonrenewable Resource. (Discrete Applied Mathematics 35 (1992) 205-219)

De Werra, D. and J. Blazewicz, Some preemptive open shop scheduling problems with a renewable or a nonrenewable resource, Discrete Applied Mathematics 35 (1992) 205-219. An edge coloring model is presented for a preemptive open shop problem. Constraints generated by a single resource have to be taken into account. The case of a renewable and of a nonrenewable resource as considered. Since the e...

متن کامل

Preemptive open shop scheduling with multiprocessors: polynomial cases and applications

This paper addresses a multiprocessor generalization of the preemptive open-shop scheduling problem. The set of processors is partitioned into two groups and the operations of the jobs may require either single processors in either group or simultaneously all processors from the same group. We consider two variants depending on whether preemptions are allowed at any fractional time point or onl...

متن کامل

Generalized Cyclic Open Shop Scheduling and a Hybrid Algorithm

In this paper, we first introduce a generalized version of open shop scheduling (OSS), called generalized cyclic open shop scheduling (GCOSS) and then develop a hybrid method of metaheuristic to solve this problem. Open shop scheduling is concerned with processing n jobs on m machines, where each job has exactly m operations and operation i of each job has to be processed on machine i . However...

متن کامل

Restrictions and Preassignments in Preemptive open Shop Scheduling

Preemptive open shop scheduling can be viewed as an edge coloring problem in a bipartite multigraph. In some applications, restrictions of colors (in particular preassignments) are made for some edges. We give characterizations of graphs where some special preassignments can be embedded in a minimum coloring (number of colors = maximum degree). The case of restricted colorings of trees is shown...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Applied Mathematics

سال: 1992

ISSN: 0166-218X

DOI: 10.1016/0166-218x(92)90245-6